Our work
Beverage plant holds ±0.5% dosing across three CIP lines
Client
Beverage producer
Industry
Food & beverage
Location
Surabaya, Indonesia
Products used
ND-40

Challenge
Manual chemical dosing on three clean-in-place lines caused batch-to-batch variation and occasional over-dosing that wasted caustic and rinse water.
Solution
We delivered a pre-piped skid with three ND-40 pumps under Modbus control, tied into the plant PLC. Dosing now follows conductivity feedback in closed loop; the skid was commissioned in two days.
Measured results
±0.5%
Dosing repeatability
-17%
Caustic consumption
2 days
On-site commissioning
“Commissioning took two days including operator training. The skid simply works.”
A similar duty on your site?