Get in touch

Contact & inquiry

One form, one owner. Your inquiry lands with an application engineer, and the reply carries curves — not a brochure.

Direct lines

Plant address

No. 88 Haichuan Road, Beilun District, Ningbo, Zhejiang, China

Mon–Sat · 8:30–18:00 (UTC+8)

Answered by engineers, not a sales bot. Replies within 24 hours, Mon–Sat.

Frequently asked

What is your minimum order?

One pump. Single replacement units get the same engineering attention as fleet orders; OEM series production starts with a tooling discussion.

What is the typical lead time?

Standard models ship in 4–6 weeks. Wear parts and spares held in consignment stock ship within one week.

Which payment terms do you accept?

T/T (30% deposit, balance before shipment) as standard; irrevocable L/C at sight for larger orders.

What warranty do you provide?

18 months from commissioning or 24 months from shipment, whichever comes first. Wear parts carry duty-based guarantees agreed per project.

Can you match an existing pump from another maker?

Usually. Send nameplate photos and flange dimensions — we cross-reference the duty point and quote a drop-in equivalent with test curves.

Render diagnostics